Opening soon

Xiong'an to Shangqiu High-Speed Railway

雄商高铁

The Xiong'an-Shangqiu section is the final missing northern link of the Beijing-Hong Kong high-speed corridor between Xiong'an and Shangqiu. It brings new high-speed stations to central Hebei, western Shandong and eastern Henan.

Opening status

Expected by the end of September 2026, subject to official confirmation.

This page tracks the project before passenger services begin. Route and station data may be updated after the official timetable is published on 12306.

Stations

  1. 1Xiong'an · 雄安0 km
  2. 2Renqiu West · 任丘西42.7 km
  3. 3Suning Hejian · 肃宁河间77.4 km
  4. 4Shenzhou East · 深州东128.8 km
  5. 5Hengshui South · 衡水南164.1 km
  6. 6Zaoqiang South · 枣强南211.6 km
  7. 7Qinghe West · 清河西240.3 km
  8. 8Linqing East · 临清东273.9 km
  9. 9Liaocheng West · 聊城西319.4 km
  10. 10Yanggu East · 阳谷东345.5 km
  11. 11Taiqian East · 台前东367.3 km
  12. 12Liangshan · 梁山390.1 km
  13. 13Yuncheng · 郓城414.7 km
  14. 14Heze East · 菏泽东471.1 km
  15. 15Caoxian West · 曹县西510.2 km
  16. 16Shangqiu · 商丘560.6 km

Why this line matters

  • It connects Xiong'an with Hengshui, Liaocheng, Heze and Shangqiu on a direct 350 km/h corridor.
  • It fills the gap between the Beijing-Xiong'an and Shangqiu-Lushan sections of the Beijing-Hong Kong corridor.
  • Cities including Renqiu, Suning-Hejian, Shenzhou, Hengshui, Linqing, Yanggu and Caoxian gain or improve high-speed rail access.

Frequently asked questions

Is the Xiong'an-Shangqiu high-speed railway open?

As of the latest update, the line is in its opening run-up and has not yet been confirmed as open for passenger service. Check 12306 before planning a trip.

Which major stations are on the line?

The passenger route runs through Xiong'an, Renqiu West, Suning-Hejian, Shenzhou East, Hengshui South, Zaoqiang South, Qinghe West, Linqing East, Liaocheng West, Yanggu East, Taiqian East, Liangshan, Yuncheng, Heze East, Caoxian West and Shangqiu.

Does the line shorten the trip from Shangqiu to Beijing?

Once the full Beijing-Hong Kong corridor is connected, the route is expected to reduce the need to detour through Zhengzhou. The final timetable and journey times will be published closer to opening.